Vision
Department Of Engineering Services (Civil & Structural Engineering Cell) of IICB, Kolkata is catering services in the broad areas of Infrastructural Development for Scientific Research Activities - Maintenance Services - Renovations of Laboratories & Common facilities-Expansion of facilities - Grass Root Construction activities etc. of IICB Main Building, Other Annex Buildings, Ancillary Buildings, Staff Quarters located inside the campus, Any kind of structures of IICB Campus and upgradations, Disposal system Network maintenance Services and upgradations, upgradations-maintenance of Biological - Radioactive -Laboratory waste disposals, Basic Engineering works for proposed Proteomics Research Facilities Project on 4 acres CSIR acquired land at Sector-V, Salt Lake, Kolkata etc. |
 |
 |
Dr Asish Kumar Sen (Jr.) (Head)
Sct G |
| Civil |
Electrical |
Mr. Sumit Guha
Executive Engineer(I)
Mr. Sandip Saha
Executive Engineer(II)
Mr Susanta Roy
Asst Executive Engineer
Mrs Nirali Bage
Junior Engineer (II) |
Mr D.P. Das
Executive Engineer |
|
|
Electrical:
Presently there are 4 numbers of 6 Kv/400 V unit type substations to receive supply from CESC and conversion to medium voltage for our application. Our average intake is approximately 1100 KW. In addition to existing facilities installation of 1000 KVA outdoor type substation has been taken up and completed. Constant and continuous power supply arrangement for Revcos and Deep freezers from planning stage to commissioning are being managed by this division.
Airconditioning:
The AC facility is being provided to all the laboratories, library and other infrastructure divisions including auditorium. To achieve this there is a 360 tr. centrifugal chilling unit and cooling is done through circulation of chilled water to different air handling units installed at different floors. For central instrument room a separate 30 tr. A/C plant has been installed for cooling. Animal house is kept cool by 100% fresh air basis with the help of 80 tr. Capacity reciprocating plant, which has been installed with stand-by unit for 24 hours and 365 days to maintain the animals in desired conditions. Besides, there are about 220 numbers room air cooler installed in different labs, refrigerators, ultra deep freezers in each lab. There are seven numbers of cold rooms and all are maintained at 4°C for research work carried out by research workers continuously.
The jobs carried out are as follows :
- Repair and painting of the main building
- Renovation of the Library
- Construction of the underground reservoirs
- Costruction of the storage shade
- Renovation of the Instrument Division
- Construction of a new fountain
- Remodelling of various laboratories
|